Power Plants
Power Plant
Feasibility Study
As shown in our Manufacturing Industry Case Study the results from burning a solid low-calorific value Agro Waste fuel (like biomass or coal) shows a 16% cost saving.
For each 10MW of power plant output, one 20,000 L/hr Brown’s Gas Generator is needed.
Our generators are modular in design and can be connected in parallel, for example, each connected bank of five machines will output 100,000 L/hr, capable of supplying a 25 MW power plant boiler.

Ready to Grow?
Get in Touch
Publisher
YBG Group International Pty Ltd
ACN 636 934 999
ABN 22 636 934 999
Sydney, Australia