HHO
Case Study – NG
Trial Partner:
TUBACEX INDIA Pvt Ltd
Umbergaon, Gujarat

natural gas
Report Data: January 2021
The evaluation team conducted on-site investigations on the authenticity of the combustion-supporting energy-saving transformation of a 2000 L/hr Brown’s Gas HHO energy machine with a 20 SCM natural gas Forehearth Furnace.
The furnace air-blower and hho generator were connected to the furnace temperature controller for control purposes to the furnace.
Proof of 100% safety in the workplace
10 day trial between 7 to 17 January 2021
With 10000 L/hr hho generator savings estimate 15%

BEFORE and AFTER

Company
Publisher © 2022 YBG GROUP INTERNATIONAL PTY LTD
Australian Company Number:
ACN 636 934 999
Tax Number:
ABN 22 636 934 999
All Rights Reserved
Contact
presidentceo@yullbrownsgas.com
+61 449 703 635
5 Milloo Parade
Cheero Point NSW 2083
Australia