8.5% NG Reduction:
Brown’s Gas System 7500
2023
Borosil Renewables Limited – Bharuch, India
The technological transformation of a Natural Gas Forehearth Furnace with a 7,500 L/hr Brown’s Gas Oxyhydrogen Generator in Bharuch, India saved 8.5% of natural gas consumed and showed an ROI of 9 months.
ENGINEER TEAM AFTER INSTALLATION
VIEW THE CASE STUDY
VIEW THE TEMPERATURE CONTROLLED CABIN
READ THE CLIENT TESTIMONIAL LETTER

WATCH THE VIDEO OF THE INSTALLATION ONSITE
VIEW PHOTO OF THE COMBUSTION AIR HEADERS

Ready to reduce your fuel costs?
Get in Touch
Company
Links
Publisher
YBG Group International Pty Ltd
ACN 636 934 999
ABN 22 636 934 999
Sydney, Australia
© YBG Group International Pty Ltd 2018-2023.
Brown’s Gas® with the Australian Securities and Investment Commission.
All rights reserved.
